Do you own a PV plantfrom 2009–2010?

Thanks to LEX OZE III, you can gain a second source of income without losing subsidies.

Act No. 87/2025 Coll. (LEX OZE III), effective from August 1, 2025, allows operators of photovoltaic power plants with a supported feed-in tariff to add battery storage without losing their existing support for the first time.

Free Consultation

Effective Date

August 1, 2025

LEX OZE III is effective
from August 1, 2025.

Legal Basis

Section 11a(8)

The new provision of the Act
allows operating BESS
without losing subsidies.

Target Group

PV Plants 2006–2012

Power plants with a supported
feed-in tariff.

What does the law actually allow?

Energy Act, Section 11a(8)

Electrical energy supplied from an accumulation facility to the electricity grid is not considered electricity produced from a supported energy source...

Full text of the Act (CZ)
PV Plant
Producer's Meter
$
Feed-in Tariff
+
BESS
Flexibility Aggregator
New Income

Practical consequence: the part of the PV plant intended for drawing feed-in support (green bonus) remains separately measured, and the battery operates in parallel as an independent device. The right to the feed-in tariff arises based on production from the PV plant measured by the producer's meter — not according to where the energy ultimately flows.

For PV plant owners from 2006–2012, this means that by building a BESS, they will not lose the feed-in tariff they fixed for 20 years.

Why not wait until the support ends?

Prepare the project in peace

Project preparation, permitting, and connection take months.

Start earning earlier

BESS can generate new income even before the support ends.

Avoid market congestion

After the support ends, a large number of power plants will seek modernization.

Increase PV value

A modernized power plant has a higher market value and better options for further operation.

What we will arrange for you

Legal Analysis

We will check if your power plant is suitable for expansion under LEX OZE III.

Technical Design

We will design the optimal size and configuration of the battery storage.

Project Documentation

Complete project preparation including all requirements.

Administration

Communication with the distributor, authorities, and other institutions.

SolarMon EMS

Delivery of our own system for control, monitoring, and trading.

Trading Strategy

We will propose a method for entering the market and optimizing revenues.

SOLARMON GRID

We will trade your energy. Aggregation and commercial dispatch in your local distribution systems (LDS).

What you specifically get

01.

Subsidies Preservation

The existing feed-in tariff (green bonus) is preserved for the entire duration of the support — production from the PV plant is measured separately, and support is not compromised.

02.

Second Source of Income

Battery storage can provide ancillary services (FCR, aFRR, mFRR) and trade on markets, creating a new stable source of income.

03.

Higher PV Value

A modernized power plant is more flexible, competitive, and has a higher market value even after the support ends.

Why SOLARMONITORING, s.r.o.?

In-house platform
SolarMon 3.0

Experience with PV
and BESS

Trading strategy
design

24/7
Monitoring

Flexibility integration
and aggregation

Partner for the entire
project lifecycle

Prepare your power plant for the future

Looking for an optimal solution for your energy project?
We will gladly provide you with all the information and advise you on the next steps.