A new source of income
for your energy
projects

  • Standalone turnkey battery storage designed for flexibility trading, energy arbitrage, and providing ancillary services.
  • Battery storage for photovoltaic and wind power plants in a hybrid setup according to the LEX OZE III legislative framework, allowing more efficient use of connection capacity and increasing the economic return of the project.
  • Battery storage for hydroelectric power plants, ensuring production optimization, energy storage, and expanding the possibilities of providing ancillary services to the energy grid.
LEX OZE III
in compliance with legislation
More than 16 years
of experience
24/7
Device service
and 24/7 monitoring

Turnkey delivery – from project documentation to energy trading!

A partner who takes responsibility for the entire project

1
Project
Solution design
2
Permits
Documentation
3
Construction
Installation
4
Connection
Distribution grid
5
Functional Tests
Technology and compliance verification
6
Final Approval
Continuous operation
7
Device Service
and 24/7 monitoring
8
SOLARMON GRID
own energy trading

Project Documentation and Engineering

  • Securing building permits and final approval.
  • Preparing documentation for UTP and UPOS.
  • Coordination of tests, inspections, and approval processes.
  • Support in selecting a trader and aggregator.
  • Business model and flexibility monetization.

We represent you in dealings with the distributor

  • Submitting a connection request.
  • Incorporating the distributor's requirements into the project.
  • Handling changes to the connection agreement.
  • Technical coordination with the distribution company.
  • Support up to successful commissioning.

Construction Work and Equipment Installation

  • Site preparation and earthworks.
  • Construction of foundations for BESS, PCS, and transformer substation.
  • Delivery and installation of complete technology.
  • Connection of MV and LV distribution systems.
  • Integration of EMS, SCADA, and safety systems.
  • Commissioning, testing, and bringing the equipment into operation.

24/7 Service and Monitoring Throughout the Lifespan

  • Continuous remote monitoring of BESS, BMS, PCS, and communication.
  • Automated data collection and evaluation.
  • Early identification of deviations and faults.
  • Records of service interventions and equipment history.
  • Regular preventive inspections at the installation site.
  • Warranty and post-warranty service throughout the project's operation.

TECHNOLOGY

Comprehensive system solutions for energy source owners

Modular solution
with liquid cooling

  • System output up to 2.0 MWp
  • Capacity up to 5.1 MWh
  • LiFePO4 cells
  • IP55 / IP67
  • C5 corrosion, 20 years of reliability
  • Integrated cooling system
  • Fire protection

Container solution
BYD Blade Battery

  • 20-foot container systems
  • Capacity 3.0 – 6.0 MWh per container
  • Modular scaling up to tens or hundreds of MWh
  • LiFePO4 (BYD Blade Battery)
  • High safety, long lifespan
  • Stable operational parameters

Power Conversion System (PCS)

For the power conversion system (PCS), we use proven solutions from Delta Electronics, Hopewind, and Sinexcel, which allows us to design the optimal configuration for a specific application, required performance, connection conditions, and project economics.

DELTA
Delta
HOPEWIND
Hopewind
SINEXCEL
Sinexcel

Our Projects

Examples of our work and battery storage (BESS) installations across the Czech Republic.

Teplice nad Metují

Teplice nad Metují

Expansion of PV (350 kWp) with BESS with a capacity of 1,075 kWh (modular type).

Nové Město nad Metují

Nové Město nad Metují

Expansion of PV (967 kWp) with BESS with a capacity of 3,446 kWh (modular + container).

Měnín

Měnín

Expansion of PV (3,300 kWp) with BESS (10,032 kWh) and a HopeWind transformer substation (BYD CUBE).

Vstiš

Vstiš

Expansion of PV (995 kWp) with BESS with a capacity of 3,343 kWh and a Delta Electronics PCS.

Heřmanov

Heřmanov

Expansion of PV (750 kWp) with BESS with a capacity of 2,057 kWh (modular type).

Jindřichův Hradec

Jindřichův Hradec

Expansion of PV (1,318 kWp) with BESS (4,018 kWh) and a HopeWind transformer substation (BYD CUBE).

Prepare your power plant for the future

Looking for an optimal solution for your energy project?
We will gladly provide you with all the information and advise you on the next steps.